The difference between a one-hour job and an all-day job is huge
I've been using a cheap inflatable booth for about a year now. When I first set it up, I was spending maybe 45 minutes just getting the thing inflated, taped, filtered, and ready. Then cleanup was another 30. Now I've got it down to about 10 minutes setup and 10 cleanup. The actual painting time didn't change, but the whole day feels different. Curious what others have done to cut down the overhead. Not talking about big purchases, just workflow stuff.
The biggest thing for me was leaving the booth inflated permanently in the garage. I know not everyone has the space, but once I stopped deflating it after every job, my setup time went to almost zero. Just unzip, turn on the fan, and go. Cleanup is still a pain though.
What kind of filters are yyou running? I found that swapping to a larger intake filter reduced my inflation time because the fan wasn't working as hard. Also, I stopped taping the seams every time and just use a few clamps on the main joints. Sounds lazy but it holds fine for waterborne.
Clamps on the seams is a good idea. i've been taping like a maniac. Do you get any leakage with clamps?
Minor leakage, but the fan compensates. I only tape the bottom edge where overspray collects. The rest is fine.
I think the real difference is whether you're doing one job or a batch. If I know I have three small parts to paint, I'll set up once and do them all in a row. Previously I'd set up, paint one, clean up, then repeat. That alone cut my day in half. But for a single large job, the overhead is what it is. I don't see how you get around it unless you have a dedicated space.
Has anyone tried a quick-release connector on the inflation port? I've been thinking about it but worried about leaks.
I hadn't considered bathcing. That's a good point. I usually just do one project at a time but maybe I should plan ahead more. The clamp idea is interesting too. I might try that on the upper seams where I don't get much buildup.
Also, don't underestimate the value of a good headlamp or work light inside the booth. Sounds dumb, but when I can see what I'm doing I don't waste time second-guessing coverage. That saves me from redoing passes
Lighting is huge. I mounted two LED strips inside mine. Best twenty bucks I ever spent. Setup still takes time but at least I'm not squinting.
Post a reply
Trending Discussions
- What's safe to use on the transparent windows? 12 replies
- My painting schedule is finally based on conditions instead of habit 10 replies
- My van is too long for the booth i originally planned to buy 10 replies
- Can a differential pressure gauge help identify a ventilation problem? 9 replies
- How much does the storage room temperature matter? 11 replies